Manufacturing and Storage facility, Nordpark Alzenau, Brentanostraße 7+8
Additional information
| Time period | |
|---|---|
| Client | |
| Services | CFD-Simulation, Simulation/analysis of an existing steel structure at high temperatures Form |
CFD simulation combined with structural analysis (FDS/SAFIR) of existing manufacturing/storage facility with sprinkler system.
Drucken








