Primary and Secondary School Altendorf – Container Facility
Additional information
| Floors | EG bis 1. OG |
|---|---|
| Use | Schule |
| Client | Stadt Chemnitz Gebäudemanagement und Hochbau SG Bildungseinrichtung |
| Time period | |
| Services | |
| Gross area | ca. 375 m ² |
| Maximale Länge x Breite x Höhe | Ca. 15 m x 25 m x 7 m |
This is an existing container facility. A hot measurement was carried out on the basis of the fire load determination, which enabled the continued use of the school.
Drucken






