Container Module Systems – Adapteo GmbH
Additional information
Floors | EG und 1. OG |
---|---|
Use | Schule |
Client | |
Time period | |
Gross area | Diverse |
Maximale Länge x Breite x Höhe | Diverse |
We are proud to have worked with Adapteo GmbH to create a generalised hot measurement report that can be reused for different purposes. The report required a high level of detail and calculation integrity. It has been already successfully used in several Bündesländer.
An additional calculation was required to prove the required width of a brandlastfreien strip around the building. For this particular case a rubbish container was considered in combination with a CFD simulation of local wind conditions.
Drucken