Primary and Secondary School Altendorf – Container Facility
Additional information
Floors | EG bis 1. OG |
---|---|
Use | Schule |
Client | Stadt Chemnitz Gebäudemanagement und Hochbau SG Bildungseinrichtung |
Time period | |
Services | |
Gross area | ca. 375 m ² |
Maximale Länge x Breite x Höhe | Ca. 15 m x 25 m x 7 m |
This is an existing container facility. A hot measurement was carried out on the basis of the fire load determination, which enabled the continued use of the school.
Drucken