Logistic centre and Warehouse facility: Publikat GmbH
Additional information
Time period | |
---|---|
Client | |
Services | CFD-Simulation, Simulation/analysis of a steel hall at high temperatures, Naturbrandberechnung |
Hot measurement for a logistic centre and warehouse. We were happy to support Publikat GmbH in the continued expansion of the their warehouse and logistic facility in Großostheim. A hot measurement of a 1 storey steel shelving/stage system was required. Additional challenges of a conveyor system and sprinklers, meant that a CFD analysis (FDS/Safir) was neccesary to prove the desired fire resistance.
Drucken