Manufacturing and Storage facility, Nordpark Alzenau, Brentanostraße 7+8
Additional information
Time period | |
---|---|
Client | |
Services | CFD-Simulation, Simulation/analysis of an existing steel structure at high temperatures Form |
CFD simulation combined with structural analysis (FDS/SAFIR) of existing manufacturing/storage facility with sprinkler system.
Drucken