References

Category
Filters Sort results
Time period
2022-2019
Client
Diehl Projekt- und Verwaltungs GmbH & Co. KG
Construction costs
Services
Bauphysik
Statik
construction physics
Time period
2021-2022
Client
Ingeni SARL
Construction costs
Services
CFD-Simulation
thermal insulation
Simulation/analysis of building components at high temperatures
Time period
2021
Client
Landkreis Darmstadt Dieburg (LaDiDa)
Construction costs
Services
3-D Heißbemessung
thermal insulation
Naturbrandberechnung
Time period
2022-2019
Client
Radeberger Brauerei GmbH
Construction costs
Services
3-D Heißbemessung
Brandschutzkonzepte
thermal insulation
Naturbrandberechnung
Time period
2022-2018
Client
Rene Reif Consulting GmbH, München
Construction costs
>25 Mio
Services
Außenlämmessungen
building physics, sound and thermal insulation, acoustics, immission insulation, construction and demolishing noise conception
BEG-Förderung
Energy consulting according to KfW guidelines
Erschütterungsmessung
thermal bridge calculations
Time period
2021-2015
Client
IBM Hanau
Construction costs
1.8 Mio.
Services
fire protection and safety plan
Brandschutztechnische Überwachung
Time period
2021-2022
Client
Construction costs
Services
CFD-Simulation
Glasbruchberechnung
thermal insulation
Statische Nachweise
Time period
2021-2013
Client
Museums Bausteine Frankfurt
Construction costs
>25 Mio
Services
Brandfallsteuermatrix
fire protection and safety plan
fire safety regulations
Heißbemessung von denkmalgeschützten Holzbalkendecken
Time period
2021
Client
BauWerte Projekte GmbH
Construction costs
Services
thermal insulation
Time period
2021
Client
Landkreis Darmstadt Dieburg (LaDiDa)
Construction costs
Services
thermal insulation
Simulation/analysis of building components at high temperatures
Naturbrandberechnung
Time period
2021-2004
Client
Frankfurt Building Authority
Construction costs
Services
Fire protection and -safety plan for a listed/historic administrative building
escape-and-rescue plans
Glasbruchberechnung
Time period
2021-2022
Client
Publikat GmbH
Construction costs
Services
CFD-Simulation
Simulation/analysis of a steel hall at high temperatures
Naturbrandberechnung
Time period
2021-2022
Client
OVG Cloud S.à.r.l.
Construction costs
Services
3-D thermal bridges
thermal insulation
Time period
2019-2018
Client
BEOS AG Niederlassung Frankfurt a. M.
Construction costs
Services
CFD-Simulation
Simulation/analysis of an existing steel structure at high temperatures Form
Time period
2019-2018
Client
Main-Taunus District Department of School Construction
Construction costs
1,1 Mio.
Services
construction noise concept
Fire prevention
immission control
room acoustics
acoustic measurements
noise control
structural engineering HOAI 1-4, structural fire protection
Time period
2019-2017
Client
Lang & Cie. Real Estate AG
Construction costs
10 Mio.
Services
Abbruchlärmkonzept
Acoustics
construction noise concept
Bauphysik
immission control
Kontrollmessung
noise control
Tageslichtstudie
construction physics
Time period
2019-2017
Client
GeRo Real Estate AG
Construction costs
6Mio
Services
static, fire protection, building acoustics, energy certificate
Time period
2019-2016
Client
Hafenbogen GmbH & Co. KG
Construction costs
>25 Mio
Services
Außenlämmessungen
building acoustistics
immission control
room acoustics
Tageslichtsimulation
thermal building physics
Time period
2018-2016
Client
Lang & Cie. Real Estate AG
Construction costs
8 Mio
Services
building acoustistics
immission control
room acoustics
Tageslichtberechnung
thermal building physics
Thermische Gebäudesimulation
Time period
2018-2016
Client
Arthur Wiener Liegenschaften
Construction costs
5 Mio.
Services
immission control
Lärmmessung
noise control
structural engineering HOAI 1-8
construction physics
Time period
2018-2016
Client
Diehl Projekt- und Verwaltungs GmbH & Co. KG
Construction costs
5,6 Mio
Services
EnEV
noise control
Statik
Time period
2018-2015
Client
Lang+Cie
Construction costs
23 Mio. 
Services
construction noise concept
immission insulation for car park and ventilation system
LEED simulation
room acoustics
noise immission calculation for mechanical workshop
noise insulation certificate
daylight simulation for LEED
construction physics
Time period
2018-2014
Client
Galeria Kaufhof
Construction costs
Services
fire protection and safety plan
CFD-Simulation
escape-and-rescue plans
Simulation/analysis of existing ribbed slab ceilings at high temperatures
Time period
2018-2015
Client
GeRo Real Estate AG
Construction costs
5 Mio.
Services
structural engineering HOAI 1-8
Time period
2017-2015
Client
WO-AL Bauträger GmbH
Construction costs
4,9 Mio.
Services
Schal- und Bewährungspläne
Statik
Time period
2017-2015
Client
Lang&Cie. GmbH
Construction costs
Services
Acoustics
Baulärm
immission control
noise control
Siege
Thermische Gebäudesimulation
construction physics
Time period
2017-2011
Client
OFB
Construction costs
>25 Mio
Services
building acoustistics
construction noise concept
Baulärmmessungen
EnEV-Nachweis
Immissionsschutznachweis
room acoustics
thermal simulation
Time period
2017-2015
Client
OFB Hr. Hundertmark
Construction costs
14 Mio.
Services
escape-and-rescue plans
structural engineering HOAI 1-8
fire protection and -safety plan
Time period
2017-2015
Client
Lang & Cie. GmbH
Construction costs
9 Mio.
Services
construction noise concept
Bauphysik
Gebäude- und Tageslichtsimulation
immission control
Leed-Zertifizierung
room acoustics
noise control
Siege
Thermische Komfortsimulation
construction physics
Time period
2019-2017
Client
OFB Hr. Hundertmark
Construction costs
9 Mio.
Services
structural engineering HOAI 1-8, preventive fire protection, Planning of Evacuation and Rescue Ways
Time period
2017-2010
Client
Planungsring Ressel GmbH Hr. Werner
Construction costs
10,5 Mio.
Services
Structural fire protection
Betonsanierungsgutachten
noise control
structural engineering HOAI 1-8
construction physics
Time period
2017-2016
Client
Neunte Argon Lahnstraße 37 GmbH
Construction costs
>25 Mio
Services
Außenlärmpegelmessung
Tageslichtberechnung
Time period
2017-2000
Client
DeTe-Immobilien/Strabag Hr. Rockel
Construction costs
7,5 Mio. 
Services
3-D thermal bridge calculations
structural fire protection
Noise immission calculation
acoustic measurements
noise control
Structural engineering HOAI 1-4
construction physics
Time period
2017-2015
Client
WO-AL Bauträger GmbH
Construction costs
4,9 Mio.
Services
Schal- und Bewährungspläne
Statik
Time period
2017-2015
Client
Lang & Cie. GmbH
Construction costs
10Mio
Services
Acoustics
construction noise concept
DGNB
energy plan
immission control
noise control
Siege
Tageslichtberechnung
Thermische Gebäudesimulation
construction physics
Time period
Client
HIH Property Management
Construction costs
Services
Naturbrandberechnung mehrerer Büronutzungen, Heißbemessung einer betonummantelten Stahlkonstruktion
Time period
Client
Erlanger Höfe GmbH & Co. KG
Construction costs
>25 Mio
Services
Tageslichtberechnung, Besonnung und Verschattungsstudie zum Nachweise gesunder Wohn- und Arbeitsverhältnisse
Time period
2015-2012
Client
Da-Di-Werk
Construction costs
11 Mio.
Services
structuraql engineering HOAI 1-6, thermal, sound and immission insulation calculation, room acoustics, temperatural calculation of existing basin
Time period
2015-2011
Client
Lang+Cie, Fr. Keilholz
Construction costs
7,0 Mio.
Services
construction noise measurment
fire protection and safety plan
EnEV
temperaural calculation of ripped ceiling
room acoustics
sound immission insulation
noise control
structural engineering HOAI 1-6
calculation of shading of the entrance foyer
construction physics
Time period
2014-2011
Client
AGIMA AG, Hr. Bach
Construction costs
Services
fire protection and safety plan
escape-and-rescue plan for people with disabilities
fire control matrix
structural fire protection
Time period
2014-2009
Client
Hochbauamt Stadt Frankfurt Hr. Winkler
Construction costs
40 Mio.
Services
structural engineering HOAI 1-8, strucutral fire protection
Time period
2014-2009
Client
Hochbauamt Frankfurt am Main Hr.Boy
Construction costs
Services
fire protection and safety plan
CFD-Simulation
Entrauchung
thermal insulation
Time period
2014-2009
Client
Pepsico Germany
Construction costs
Services
Fire protection and -safety plan for the conversion of an industrial warehouse
Time period
2014 - 2010
Client
Architects Witan, Russ, Lang
Construction costs
5,7 Mio.
Services
Fire prevention
noise control
Statische Nachweise
construction physics
Time period
2014-2012
Client
Frankfurt Building Authority
Construction costs
0.6 Mio.
Services
structural fire protection
structural engineering HOAI 1-8
fire protection and -safety plan
Time period
2014-2012
Client
BKRZ Frankfurt
Construction costs
Services
structural fire protection
passive house design
noise control
Thermische Gebäudesimulation
structural engineering HOAI 1-8
construction physics
Time period
2014-2012
Client
Lang+Cie
Construction costs
23 Mio. 
Services
thermal insulation
immission control certification
room acoustics
room acoustics simulations
noise control calculations
noise insulation certificate
construction physics
Time period
2014-2012
Client
Lang+Cie Hr. Holler
Construction costs
10 Mio.
Services
DGNB
room acoustics
noise control
construction physics
thermal insulation, noise control, room acoustics, DGNB
Time period
2014-2011
Client
Frankfurt Building Authority
Construction costs
1.2 Mio.
Services
structural fire protection
structural engineering HOAI 1-8
fire protection and -safety plan
Time period
2014-2011
Client
Lang+Cie Hr. Geiger
Construction costs
35 Mio. 
Services
immission control certification
passive house design
room acoustics
Raumakustische Simulationen
noise control
noise insulation certificate
thermal simulation
Time period
2013-2011
Client
Lang+Cie Hr. Holler
Construction costs
8 Mio
Services
thermal insulation, noise control, DGNB Audit, room acoustics simulation, thermal building physics, sound immission calculation, sound measurement, H&S coordination
Time period
2013-2011
Client
Codema Fr. Schimsheimer
Construction costs
Services
Certification according to PHPP program for passive houses
noise control
thermal simulation of the ground floor
Time period
2013-2011
Client
Hochbauamt Frankfurt Fr. Igel
Construction costs
Services
Nachweis nach PHPP Programm für Passivhäuser, Schallschutz, Raumakustik, Schallimmissionsschutz, Thermische Simulation der Nachtauskühlung
Time period
2013-2012
Client
Frankfurt Building Authority
Construction costs
1 Mio.
Services
structural fire protection
passive house design
noise control
structural engineering HOAI 1-8
construction physics
Time period
2013-2011
Client
DAV Hr.Sterner
Construction costs
Services
fire protection and safety plan
noise control certification
H&S coordination planning and implementation phase
structural engineering HOAI 1-6
thermal insulation certification
Time period
2013-2012
Client
PM Architekten Hr. Pischulti
Construction costs
15 Mio.
Services
calculation of CO2-reductions
passive house design
room acoustics
noise control
thermal simulation
Time period
2013-2009
Client
Nordwestkrankenhaus Hr. Lutz
Construction costs
Services
H&S coordination planning and implementation phase
Time period
2013-2012
Client
KonzeptBau GmbH Hr. Lange
Construction costs
Services
H&S coordination planning and implementation phase
Time period
2013-2008
Client
F40 GmbH Fr. Hemmerle-Neber
Construction costs
45 Mio. 
Services
KFW-70 planning
structural fire protection
noise control
structural engineering HOAI 1-6
construction physics
Time period
2013-2012
Client
Arthur Wiener Liegenschaften
Construction costs
Services
noise control
H&S coordination planning and implementation phase
structural engineering HOAI 1-6
construction physics
Time period
2013-2011
Client
Lang+Cie Hr. Glatter
Construction costs
15 Mio.
Services
Thermal insulation, noise controll, DGNB Audit, room acoustics, room acoustics simulation, thermal simulation, daylight simulation, thermal building physics, sound immission calculation, sound measurement
Time period
2013-2001
Client
OFB Hr. Hablowetz
Construction costs
30 Mio. 
Services
EnEV 2009
preliminary passive house concept as part of an acquisition
room acoustics
noise control
Structural engineering HOAI 1-4
thermal building physics
Time period
2012-2010
Client
Hochbauamt Frankfurt Hr.Starnowsky
Construction costs
Services
Structural fire protection
Sanierung Holzdach
noise control
structural engineering HOAI 1-8
fire protection and -safety plan
construction physics
Time period
2012-2009
Client
Frankfurt Building Authority
Construction costs
9 Mio.
Services
structural fire protection
passive house design
noise control
structural engineering HOAI 1-8
fire protection and -safety plan
construction physics
Time period
2012-2006
Client
Frankfurt Building Authority, Mr. Rook
Construction costs
Services
3-D thermal bridge calculations
fire safety regulations
calculation of evacuation routes
escape-and-rescue plans
thermal building physics
thermal simulation
fire protection and -safety plan
Time period
2012, 2006-2005
Client
Urban Planning Department, Construction Management Offenbach
Construction costs
Services
3-D thermal bridges
Thermal insulation certification
Time period
2012-2010
Client
Architecture firm Scharnberger
Construction costs
15 Mio.
Services
EnEV 2009
immission control
noise control
thermal building physics
structural engineering HOAI 1-6
fire protection and -safety plan
Time period
Client
Construction costs
Services
Room acoustic simulation of a call center
Time period
Client
Happ Architekten Hr. Happ
Construction costs
Services
Simulation/analysis of an existing steel structure at high temperatures Form
Time period
Client
Broghammer.Jana. Wohlleber Fr. Kaiser
Construction costs
Services
Simulation/analysis of existing ribbed slab ceilings at high temperatures
Time period
Client
DZ Bank, Hr. Diez
Construction costs
Services
fire protection and safety plan
Time period
2012-2010
Client
Education Office of the Main-Taunus-District
Construction costs
4.2 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-8
fire protection and -safety plan
construction physics
Time period
Client
Horiba
Construction costs
>25 Mio
Services
Noise level calculations according to BimschV and TA-Lärm
noise control
structural engineering HOAI 1-6
fire protection and -safety plan
construction physics
Time period
2011-2010
Client
City of Bad Homburg, Mr. Bachmann
Construction costs
Services
temperaural calculation of ripped ceiling
structural fire protection
Time period
2011-2010
Client
OSD Prof. Fäth
Construction costs
Services
Simulation/analysis of a steel gymnasium at high temperatures
Time period
2011-2007
Client
Frankfurt Building Authority
Construction costs
6 Mio.
Services
strucuteal engineering HOAI 1-8, thermal and sound insulation, structural fire protection and safety plan, temperatural calculation of steel beams, feasibility study of roofing a yard with unprotected steel
Time period
2010-2005
Client
EPM Assetis Mr. Danielzik
Construction costs
Services
fire protection and safety plan
Time period
2010-2005
Client
EPM Assetis Mr. Danielzik
Construction costs
Services
fire protection and safety plan
Time period
2010-2009
Client
Elischer Bauen GmbH + Co. KG
Construction costs
2,7 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-6
fire protection and -safety plan
construction physics
Time period
2010-2007
Client
OFB Mr. Bender
Construction costs
5 Mio.
Services
EnEV 2009
immission control
room acoustics
room acoustics simulations
noise control
thermal building physics
structural engineering HOAI 1-6
fire protection and -safety plan
Time period
2010-2009
Client
Elischer Bauen GmbH + Co. KG/Faller+Krück
Construction costs
3 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-6
fire protection and -safety plan
construction physics
Time period
2010-2009
Client
Hochbauamt Frankfurt am Main
Construction costs
Services
building acoustistics
room acoustics
fire protection and -safety plan
construction physics
Time period
2010-2008
Client
Lang+ Groß Mrs. Keilholz
Construction costs
95 Mio. 
Services
energy plan
EnEV 2009
thermal insulation
Structural engineering HOAI 1-4
thermal building physics
Time period
2010-2008
Client
OFB Mr. Berg
Construction costs
7 Mio.
Services
dynamic simulation of the building
Certification according to PHPP
room acoustics
sound immission insulation
noise control
Time period
2010-2008
Client
Stada Mr. Leiders
Construction costs
Services
Konstruktiver Brandschutz, Heißbemessung
Time period
2010-2005
Client
EPM Assetis Mr. Danielzik
Construction costs
Services
fire protection and safety plan
Time period
2009-2008
Client
City of Bad Homburg
Construction costs
1.5 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-8
construction physics
Time period
2009-2007
Client
Aschaffenburg Building Authority, Mr. Hartmann
Construction costs
Services
calculation of evacuation routes
thermal insulation
fire protection and -safety plan
Time period
2009-2008
Client
Elischer Bauen GmbH + Co. KG/ Landes Architekten Frankfurt
Construction costs
2,7 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-6
fire protection and -safety plan
construction physics
Time period
2009-2007
Client
Hochbauamt Frankfurt am Main
Construction costs
Services
Brandschutzkonzepte
Time period
2009-2005
Client
Ludwig +Partner/Mr. Ludwig
Construction costs
1.5 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-6
construction physics
Time period
2009-2005
Client
Wohnheim/Mr. Walter
Construction costs
1.5 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-6
construction physics
Time period
2011-2009
Client
Fabergé-Museum
Construction costs
15 Mio.
Services
EnEV 2009
noise control
thermal building physics
structural engineering HOAI 1-6
Time period
2008-2006
Client
Adina Mr. Patrick Finney
Construction costs
7,5 Mio. 
Services
structural fire protection
structural engineering HOAI 1-6
Time period
2008-2007
Client
A-Z Architects
Construction costs
1.5 Mio.
Services
structural fire protection
Passive house
noise control
structural engineering HOAI 1-6
fire protection and -safety plan
construction physics
Time period
2008-2007
Client
HVB Immobilien Mrs. Tacke
Construction costs
Services
Energy passport for existing buildings according to DIN 18599
Time period
2008-2007
Client
Gross+Partner/OFB, Mr. Unger
Construction costs
30 Mio. 
Services
EnEV 2009
room acoustics
noise control
thermal building physics
thermal simulation
structural engineering HOAI 1-6
Time period
2008-2007
Client
Wohnheim GmbH/FAAG-Frankfurt am Main
Construction costs
3 Mio.
Services
structural fire protection
Structural engineering HOAI 1-4
Time period
2008-2007
Client
OFB, Mr. Kunz
Construction costs
3 Mio.
Services
room acoustics
acoustic measurements
noise control
thermal building physics
structural engineering HOAI 1-6
thermal bridge calculations
Time period
2006-2005
Client
Gemeinnützige Baugesellschaft mbH Offenbach
Construction costs
Services
H&S coordination planning and implementation phase
Time period
2006-2002
Client
Frankfurt Building Authority
Construction costs
4 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-8
construction physics
Time period
2006-2005
Client
NiBu Real Estate Management
Construction costs
Services
H&S coordination planning and implementation phase
Time period
2006-2005
Client
Frankfurt Building Authority
Construction costs
4 Mio.
Services
structural engineering HOAI 1-8, thermal and sound insulation, structural fire protection and safety plan
Time period
2006-2004
Client
Frankfurt Building Authority
Construction costs
Services
Simulation/analysis of a listed steel hall at high temperatures
Time period
2006-2005
Client
CGI, Mr. Löffler
Construction costs
0,9  Mio. 
Services
structural fire protection
structural engineering HOAI 1-6
fire protection and -safety plan
Time period
2006-2005
Client
Frankfurt Building Authority
Construction costs
Services
Brandschutzkonzepte
noise control
thermal building physics
Time period
2006-2005
Client
HVB Immobilien, Mr. Sopar
Construction costs
10 Mio.
Services
energy passport according to DIN 18599
structural fire protection
noise control
Structural engineering HOAI 1-4
fire protection and -safety plan
construction physics
Time period
2005-2004
Client
Neumann+Partner Architects, Frankfurt/Main
Construction costs
4.5 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-6
construction physics
Time period
2009
Client
Naxos-Union Real Estate Management Society
Construction costs
Services
Simulation/analysis of steel components at high temperatures
Time period
2005-2004
Client
Frankfurt Building Authority
Construction costs
Services
Simulation/analysis of a steel structure at high temperatures (automotive fire)
Time period
2005
Client
Apollo Optik Schwalbach
Construction costs
Services
H&S coordination planning and implementation phase
Time period
2004-2003
Client
Nitsch Architects, Frankfurt/Main
Construction costs
2,4 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-6
fire protection and -safety plan
construction physics
Time period
2004-2002
Client
Helvetia Insurance Company, Mr.Lewalter
Construction costs
6 Mio.
Services
3-D thermal bridge calculations
EnEV 2002
structural fire protection
noise control
SiGeKo
thermal building physics
structural engineering HOAI 1-6
Time period
2004-2003
Client
Frankfurt Building Authority
Construction costs
Services
fire protection and safety plan
Time period
2004-2000
Client
Heil Architects, Frankfurt
Construction costs
30 Mio. 
Services
noise control
thermal building physics
thermal simulation
structural engineering HOAI 1-6
WSV 95
Time period
2004-2003
Client
Heil Architects, Frankfurt
Construction costs
Services
H&S coordination planning and implementation phase
Time period
2003-2002
Client
Savings Bank Wetterau, Friedberg
Construction costs
9 Mio.
Services
3-D thermal bridge calculations
EnEV 2002
noise control
thermal building physics
thermal simulation
structural engineering HOAI 1-6
Time period
2003
Client
NHT Architects, Mr. v. Mende, Frankfurt/Main
Construction costs
Services
Vorbeugender Brandschutz, Konstruktiver Brandschutz
Time period
2003-2002
Client
Fa. Jöst Frankfurt
Construction costs
Services
H&S coordination planning and implementation phase
Time period
2003
Client
HVB Immobilien, Mr. Sopar
Construction costs
Services
structural fire protection
Time period
2003
Client
DeTe Immobilien, NDL Frankfurt
Construction costs
Services
Flurwände aus Gips, Gussasphalt im Brandfall, Heißbemessung einer Bimssteindecke im Brandfall
Time period
2002
Client
Frick+Reichert Architects, Frankfurt/Main
Construction costs
2.4 Mio.
Services
structural fire protection
noise control
thermal simulation
structural engineering HOAI 1-6
construction physics
Time period
2002
Client
Clariant, Frankfurt
Construction costs
Services
Simulation/analysis of steel components at high temperatures
Time period
2002-2001
Client
Frankfurt Building Authority
Construction costs
Services
Assessment structural fire protection of existing ceilings
Time period
2002
Client
Clariant, Frankfurt
Construction costs
Services
Structural fire protection
assessment according to EC 3 1-2
Time period
2002-2000
Client
Heil Architects, Frankfurt
Construction costs
Services
H&S coordination planning and implementation phase
Time period
2002-2000
Client
SOM New York
Construction costs
60 Mio. 
Services
coordination planning and implementation phase
quality control of the shell
noise control
SiGeKo
thermal building physics
structural engineering HOAI 1-6
WSV 95
Time period
2002-2001
Client
Fa. Jöst Frankfurt
Construction costs
Services
H&S coordination planning and implementation phase
Time period
2002
Client
Frankfurt Building Authority
Construction costs
3.6 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-8
construction physics
Time period
2002-2001
Client
Frankfurt Building Authority
Construction costs
Services
Assessment structural fire protection of existing ceilings
Time period
2002
Client
Regional Building Authority Friedberg
Construction costs
4.5 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-8
construction physics
Time period
2002-2001
Client
Frankfurt Building Authority
Construction costs
Services
Assessment structural fire protection of existing ceilings
Time period
2002
Client
Sireo, Frankfurt
Construction costs
Services
Refurbishment of an office high-rise
Time period
2002
Client
Barclays Bank Frankfurt
Construction costs
Services
H&S coordination planning and implementation phase
Time period
2001
Client
Frick+Reichert, Frankfurt
Construction costs
3 Mio.
Services
structural fire protection
noise control
thermal simulation
structural engineering HOAI 1-6
construction physics
Time period
2002
Client
German Sports Federation
Construction costs
Services
Thermal bridge calculations to install new windows
Time period
2001
Client
Praunheimer Werkstätten Frankfurt
Construction costs
Services
H&S coordination planning and implementation phase
Time period
2000-1996
Client
Helvetia Insurance Company, Mr.Lewalter
Construction costs
18 Mio.
Services
noise control
thermal building physics
structural engineering HOAI 1-6
thermal bridge calculations
WSV 95
Time period
2000
Client
Boethling Architects, Offenbach
Construction costs
Services
noise control
thermal simulation
construction physics
Time period
1999
Client
Hahnenfeld Architects, Frankfurt/Main
Construction costs
Services
thermal simulation
Time period
1998-1995
Client
Hypo Real/Köhler Architects, Frankfurt/Main
Construction costs
5,7 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-6
construction physics
Time period
1998-1996
Client
Opel
Construction costs
18 Mio.
Services
noise control
thermal building physics
thermal simulation
structural engineering HOAI 1-6
WSV 95
Time period
1998-1997
Client
Bruns Architects, Erfurt
Construction costs
3 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-6
construction physics
Time period
1998
Client
Gallwitz Architects
Construction costs
5 Mio.
Services
thermal simulation
Time period
1997-1991
Client
Neudam Architects, Königstein
Construction costs
18 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-6
construction physics
Time period
1997 - 1996
Client
Gesipa
Construction costs
45 Mio. 
Services
noise control
thermal building physics
structural engineering HOAI 1-6
WSV 95
Time period
1997
Client
Frick+Frick Architects, Frankfurt/Main
Construction costs
15 Mio.
Services
3-D thermal bridge calculations
noise control
thermal building physics
thermal simulation
structural engineering HOAI 1-6
construction physics
Time period
1996-1991
Client
H. Quandt Asset Management, Bad Homburg
Construction costs
54 Mio. 
Services
noise control
structural engineering HOAI 1-6
construction physics
Time period
1995 - 1992
Client
Bayr. Hypobank jetzt Unicredit/Hr. Sopar
Construction costs
60 Mio. 
Services
noise control
structural engineering HOAI 1-6
construction physics
Time period
1994
Client
Köhler Architects
Construction costs
50 Mio.
Services
noise control
structural engineering HOAI 1-6
construction physics
Time period
1994-1990
Client
Real Estate Management Diehl, Frankfurt/Main
Construction costs
6 Mio.
Services
noise control
structural engineering HOAI 1-6
construction physics
Time period
1992-1991
Client
Wölk Architects
Construction costs
22,5 Mio. 
Services
noise control
structural engineering HOAI 1-6
construction physics
Time period
1991
Client
Regional Building Authority Friedberg
Construction costs
15 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-8
construction physics
Time period
1993
Client
Regional Building Authority Friedberg
Construction costs
15 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-8
construction physics
Time period
1990
Client
Regional Building Authority II Frankfurt
Construction costs
4.5 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-8
construction physics
Time period
1989-1988
Client
Heil Architects, Frankfurt
Construction costs
9 Mio.
Services
noise control
structural engineering HOAI 1-6
construction physics
Time period
1990
Client
Heil Architects, Frankfurt
Construction costs
7,5 Mio. 
Services
noise control
structural engineering HOAI 1-6
construction physics
Time period
1988-1987
Client
Arch. NHT, Frankfurt am Main
Construction costs
2,7 Mio.
Services
noise control
structural engineering HOAI 1-6
construction physics
Time period
1988
Client
FAAG-Frankfurt
Construction costs
7.5 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-8
construction physics
Time period
1987
Client
FAAG-Frankfurt
Construction costs
22.5 Mio.
Services
structural fire protection
noise control
structural engineering HOAI 1-8
construction physics
Time period
Client
Savings Bank Wetterau, Friedberg
Construction costs
Services
Konstruktiver Brandschutz, Heißbemessung
Time period
Client
Frankfurt Building Authority
Construction costs
Services
fire protection and safety plan
Time period
Client
Frankfurt Building Authority
Construction costs
Services
Simulation/analysis of steel girder ceilings with fillers and ribbed slab ceilings at high temperatures
Time period
Client
Beyer+Wittig Gbr
Construction costs
Services
fire protection and safety plan
Time period
Client
Frankfurt Building Authority
Construction costs
Services
Simulation/analysis of steel girder ceilings with fillers and ribbed slab ceilings at high temperatures
Time period
Client
Frankfurt Building Authority
Construction costs
Services
Simulation/analysis of exposed steel girders in the atrium at high temperatures
Time period
Client
GWH Frankfurt, Mr. Berfacker
Construction costs
Services
Simulation/analysis of concrete ribbed ceilings at high temperatures
Time period
Client
Augustin+Partner
Construction costs
Services
Simulation/analysis of a steel hall at high temperatures
Time period
Client
Büro von der Heid, Nidda
Construction costs
Services
Simulation/analysis of a car park at high temperatures (automotive fire)
Time period
Client
DeTe Immobilien, NDL Frankfurt
Construction costs
Services
Simulation/analysis of a steel girder encased in concrete at high temperatures
Time period
Client
Frankfurt Building Authority
Construction costs
Services
fire protection and safety plan
Time period
Client
Braun + Schlockermann
Construction costs
Services
Simulation/analysis of a timber ceiling with floating screed at high temperatures
Time period
Client
Frankfurt Building Authority
Construction costs
Services
Brandschutzkonzept für einen Sonderbau /Neubau
Time period
Client
Hospital zum Heiligen Geist, Frankfurt
Construction costs
Services
H&S coordination planning and implementation phase
Time period
Client
Wohnheim
Construction costs
Services
Schallschutz zwischen Wohneinheiten und gegen Außenlärm
Time period
Client
Hessische Red Square GmbH Neu Isenburg
Construction costs
Services
H&S coordination planning and implementation phase
Time period
2002
Client
Arch. Scharnberger Frankfurt
Construction costs
Services
structural fire protection
noise control
thermal simulation
structural engineering HOAI 1-6
construction physics
Time period
Client
DeTe Immobilien
Construction costs
Services
thermal insulation
structural fire protection
Time period
Client
VGF Frankfurt
Construction costs
Services
Simulation/analysis of a glass cone of the subway station at high temperatures
Time period
Client
Deutsche Bank, Frankfurt
Construction costs
Services
thermal insulation
structural fire protection
fire protection and -safety plan
Menu