<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>2021-2022 &#8211; Lenz Weber Ingenieure GmbH</title>
	<atom:link href="https://ingweber.de/en/zeitraum/2021-2022/feed/" rel="self" type="application/rss+xml" />
	<link>https://ingweber.de/en</link>
	<description></description>
	<lastBuildDate>Mon, 09 Jan 2023 15:12:34 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.5.5</generator>

<image>
	<url>https://ingweber.de/wp-content/uploads/2020/02/cropped-lenz-weber-icon-32x32.png</url>
	<title>2021-2022 &#8211; Lenz Weber Ingenieure GmbH</title>
	<link>https://ingweber.de/en</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Logistic centre and Warehouse facility: Publikat GmbH</title>
		<link>https://ingweber.de/en/produkt/logistikzentrum-und-lagerhaus-publikat/</link>
		
		<dc:creator><![CDATA[lenz-weber-hp]]></dc:creator>
		<pubDate>Mon, 09 Jan 2023 15:09:52 +0000</pubDate>
				<guid isPermaLink="false">https://ingweber.de/?post_type=product&#038;p=8333</guid>

					<description><![CDATA[Hot measurement for a logistic centre and warehouse. We were happy to support Publikat GmbH in the continued expansion of the their warehouse and logistic facility in Großostheim. A hot measurement of a 1 storey steel shelving/stage system was required. Additional challenges of a conveyor system and sprinklers, meant that a CFD analysis (FDS/Safir) was...]]></description>
										<content:encoded><![CDATA[<p>Hot measurement for a logistic centre and warehouse. We were happy to support Publikat GmbH in the continued expansion of the their warehouse and logistic facility in Großostheim. A hot measurement of a 1 storey steel shelving/stage system was required. Additional challenges of a conveyor system and sprinklers, meant that a CFD analysis (FDS/Safir) was neccesary to prove the desired fire resistance.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Modular living facility hot-measurement</title>
		<link>https://ingweber.de/en/produkt/container-wohnanlage-heissbemessung/</link>
		
		<dc:creator><![CDATA[lenz-weber-hp]]></dc:creator>
		<pubDate>Wed, 04 Jan 2023 13:30:08 +0000</pubDate>
				<guid isPermaLink="false">https://ingweber.de/?post_type=product&#038;p=8310</guid>

					<description><![CDATA[A hot calculation with a structural calculation for F90 requirements. The calculation was standardised to allow re-use of the report for other structures from the same manufacturer. A CFD simulation validated against ETK requirements was also part of this of project. &#160;]]></description>
										<content:encoded><![CDATA[<p>A hot calculation with a structural calculation for F90 requirements. The calculation was standardised to allow re-use of the report for other structures from the same manufacturer. A CFD simulation validated against ETK requirements was also part of this of project.</p>
<p>&nbsp;</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Edge Grand Central Berlin</title>
		<link>https://ingweber.de/en/produkt/edge-grand-central-berlin/</link>
		
		<dc:creator><![CDATA[lenz-weber-hp]]></dc:creator>
		<pubDate>Wed, 04 Jan 2023 13:07:40 +0000</pubDate>
				<guid isPermaLink="false">https://ingweber.de/?post_type=product&#038;p=8306</guid>

					<description><![CDATA[The EDGE office building built near the Berlin main train-station is innovative and highly modern. Lenz Weber were responsible for the creative and economical solutions for fire protection of the steel sub-structure.]]></description>
										<content:encoded><![CDATA[<p>The EDGE office building built near the Berlin main train-station is innovative and highly modern. Lenz Weber were responsible for the creative and economical solutions for fire protection of the steel sub-structure.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Mont-Blanc Centre Geneva</title>
		<link>https://ingweber.de/en/produkt/mont-blanc-centre-genf/</link>
		
		<dc:creator><![CDATA[lenz-weber-hp]]></dc:creator>
		<pubDate>Wed, 04 Jan 2023 11:49:54 +0000</pubDate>
				<guid isPermaLink="false">https://ingweber.de/?post_type=product&#038;p=8300</guid>

					<description><![CDATA[The project is regarding the renovation of a 1950’s historically protected cinema in Geneva, the building is exceptionally interesting as the main structure is made from 30m long Aluminium frames . The work was commissioned by our colleagues at Ingeni Sarl and we worked closely with them throughout the project. Our part was to model...]]></description>
										<content:encoded><![CDATA[<table>
<tbody>
<tr>
<td>The project is regarding the renovation of a 1950’s historically protected cinema in Geneva, the building is exceptionally interesting as the main structure is made from 30m long Aluminium frames . The work was commissioned by our colleagues at Ingeni Sarl and we worked closely with them throughout the project. Our part was to model how possible fires could spread, how the smoke would develop in the building and to calculate the expected temperatures of the Aluminium superstructure. Ingeni then calculated the expected time to failure from these temperatures.</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
