<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>LP 1-8 Brandschutz &#8211; Lenz Weber Ingenieure GmbH</title>
	<atom:link href="https://ingweber.de/en/leistungen/lp-1-8-brandschutz/feed/" rel="self" type="application/rss+xml" />
	<link>https://ingweber.de/en</link>
	<description></description>
	<lastBuildDate>Fri, 16 Aug 2024 12:44:04 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.5.5</generator>

<image>
	<url>https://ingweber.de/wp-content/uploads/2020/02/cropped-lenz-weber-icon-32x32.png</url>
	<title>LP 1-8 Brandschutz &#8211; Lenz Weber Ingenieure GmbH</title>
	<link>https://ingweber.de/en</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Expansion of a Steel Container</title>
		<link>https://ingweber.de/en/produkt/aufstockung-einer-stahlcontaineranlage/</link>
		
		<dc:creator><![CDATA[ffmmedia]]></dc:creator>
		<pubDate>Fri, 16 Aug 2024 12:26:39 +0000</pubDate>
				<guid isPermaLink="false">https://ingweber.de/?post_type=product&#038;p=8504</guid>

					<description><![CDATA[The object in question is an existing single-story container facility from 2011. This facility is to be expanded by adding an additional story. For this purpose, a steel beam grid has been planned to allow for an overhang on one side and a corridor on the other side.]]></description>
										<content:encoded><![CDATA[<p>The object in question is an existing single-story container facility from 2011. This facility is to be expanded by adding an additional story. For this purpose, a steel beam grid has been planned to allow for an overhang on one side and a corridor on the other side.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Renovation of a 3-Field Sports Hall at Friedrich-Ebert School</title>
		<link>https://ingweber.de/en/produkt/sanierung-einer-3-feld-sporthalle-der-friedrich-ebert-schule/</link>
		
		<dc:creator><![CDATA[ffmmedia]]></dc:creator>
		<pubDate>Fri, 16 Aug 2024 11:40:48 +0000</pubDate>
				<guid isPermaLink="false">https://ingweber.de/?post_type=product&#038;p=8501</guid>

					<description><![CDATA[The object in question is an existing sports hall of a school. The 3-field sports hall at Friedrich-Ebert School, built in 1976, is to be completely renovated. The existing social area is connected directly to the sports hall at ground level and has a basement. The social area will be extended and expanded. The new...]]></description>
										<content:encoded><![CDATA[<p>The object in question is an existing sports hall of a school. The 3-field sports hall at Friedrich-Ebert School, built in 1976, is to be completely renovated. The existing social area is connected directly to the sports hall at ground level and has a basement. The social area will be extended and expanded. The new building components will be developed using a hybrid construction method with both solid and timber elements. The roofs will be partially planned with extensive green roofing and photovoltaic systems.</p>
<p>The existing building will be gutted and re-conceptualized in terms of space allocation in the social area along with the expansion. The floor structure in the hall and the social area will be renewed.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
