<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Max-Planck Gesellschaft, Hofgartenstraße 8, 80539 München &#8211; Lenz Weber Ingenieure GmbH</title>
	<atom:link href="https://ingweber.de/en/auftraggeber/max-planck-gesellschaft-hofgartenstrasse-8-80539-muenchen/feed/" rel="self" type="application/rss+xml" />
	<link>https://ingweber.de/en</link>
	<description></description>
	<lastBuildDate>Fri, 21 Jun 2024 09:18:05 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.5.5</generator>

<image>
	<url>https://ingweber.de/wp-content/uploads/2020/02/cropped-lenz-weber-icon-32x32.png</url>
	<title>Max-Planck Gesellschaft, Hofgartenstraße 8, 80539 München &#8211; Lenz Weber Ingenieure GmbH</title>
	<link>https://ingweber.de/en</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Office and laboratory Frankfurt</title>
		<link>https://ingweber.de/en/produkt/buero-und-labor-frankfurt/</link>
		
		<dc:creator><![CDATA[ffmmedia]]></dc:creator>
		<pubDate>Mon, 03 Jun 2024 07:46:58 +0000</pubDate>
				<guid isPermaLink="false">https://ingweber.de/?post_type=product&#038;p=8470</guid>

					<description><![CDATA[Max Planck Institute for Biophysics Frankfurt Building Description The steel hall roof of the office and laboratory building required a hot measurement to verify the integrity of the structure. This was achieved through a CFD simulation of a fire in the office rooms on the upper floor. The results showed that the steel structure had...]]></description>
										<content:encoded><![CDATA[<p><strong>Max Planck Institute for Biophysics Frankfurt</strong><br />
Building Description</p>
<table>
<tbody>
<tr>
<td>The steel hall roof of the office and laboratory building required a hot measurement to verify the integrity of the structure. This was achieved through a CFD simulation of a fire in the office rooms on the upper floor. The results showed that the steel structure had the required fire resistance duration even without the intumescent coating, so the coating did not need further maintenance.</td>
</tr>
</tbody>
</table>
<p><strong>Max Planck Institute for Biophysics Frankfurt</strong><br />
Building Description</p>
<table>
<tbody>
<tr>
<td>The steel hall roof of the office and laboratory building required a hot measurement to verify the integrity of the structure. This was achieved through a CFD simulation of a fire in the office rooms on the upper floor. The results showed that the steel structure had the required fire resistance duration even without the intumescent coating, so the coating did not need further maintenance.
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
